What does it take to build a concrete parking lot in Temecula?

Concrete parking lot building in Temecula means digging out, grading and packing the ground, then pouring rigid concrete pavement that spreads each wheel's weight over more of the ground than asphalt does, so the lot carries cars and trucks without rutting.

Most people call us when an old asphalt lot behind a shop or rental building has started rutting and holding water, or when a new lot has to go in and they want it built once. Your price mostly moves with the size of the lot, how much of it has to carry trucks, what has to come out first and how much grading it takes to get the water running the right way. The schedule usually turns more on permits and city paperwork than on the pour itself. If the walks leading to your doors are worn out too, we can price concrete sidewalk building on the same estimate, and the written estimate from my site visit gives you the figure for your own lot.

How can you tell your parking lot needs replacing?

  • Ruts where trucks turn

    You see the pavement pushed into ridges and grooves at the turns, the loading spot and the dumpster pad. That usually means the pavement is moving under heavy wheels, and the longer it goes, the deeper the ruts get and the more water they hold.

  • Water standing after rain

    Puddles sit for days in the same low spots, or the water runs toward the building instead of away from it. Standing water soaks into the ground under the pavement and softens it, so those low spots tend to sink further every season.

  • Patches on top of patches

    The same spots crack into small pieces, get patched and break up again. When a patch keeps failing, the ground under that spot has usually given out, and patching only the top keeps costing you without fixing it.

How we build a concrete parking lot

The first thing I'll ask is where the delivery trucks, trash trucks and dumpsters go, because we build those lanes and pads heavier and keep the rest of the lot built for cars instead of paying for truck strength across the whole thing. We also start on the permits and city paperwork early, since that side of a lot takes planning of its own. Then our crew tears out the old pavement, checks where the water will run, and grades and packs the subgrade, the ground the slab sits on, because a base that's only raked level settles and takes the concrete down with it. We set the forms and the rebar, steel that holds the slab together if it cracks, and pour in the cooler part of the day so the top doesn't dry out weak and dusty. Then we give it a broom finish for grip and cut control joints, shallow cuts that give cracks a straight line to follow instead of wandering. After that it cures, the wait that lets concrete gain its strength before cars roll on, and I'll tell you when it's ready. If the budget gets tight, I'd rather trim extras on top than cut into the base, because nobody sees the base on day one but it decides whether the lot is still flat years from now.

A lot usually comes with other concrete work around it. Light poles, sign posts and site walls stand on concrete footings that we set as part of the job, and if the building your lot runs up to has sunk at a corner, foundation raising brings it back up so the new pavement lines up with the doors.

  • A full lot, new or replaced

    This suits a lot that's failing all over or ground that's never been paved. We plan the whole thing at once, with the heavier sections laid out where your trucks actually run.

  • Truck lanes and service pads

    If the car spaces are holding up but the trash enclosure, the loading spot and the lane to them are breaking apart, we can rebuild just those in concrete. On a mixed lot that's often the best use of the money, because the heavy wheels are what wreck the pavement.

  • Failed sections cut out and replaced

    When the damage is in a few spots, we cut out the broken areas, fix the base under them and pour them back. It suits a lot that's sound overall with a few places where the ground gave way.

Get a written estimate for your parking lot

We reply within one business day to set a time for me to come out. I'll walk the lot with you, measure, and you get a free written estimate with no obligation.

(951) 466-2622
Based in
Temecula, CA 92592
Hours
Mon–Sun: 6 AM–11 PM

What happens after you call about a parking lot?

From your first call to the last walk-around, here's who does what and what you'll have in hand before any concrete gets ordered.

  1. Call or send the form

    Call (951) 466-2622 or use the form, and we set a time for me to come out to your lot. It helps to tell us roughly how big it is and what kind of trucks use it.

  2. Walk the lot with me

    I measure, look at where the water runs and show you on the ground where the heavy sections would go. Then you get the estimate in writing, so you can see what you're paying for before you decide.

  3. Permits, meeting, then the pour

    Once you say go, we pull the permits and set up the inspections, and the city requires a meeting with everyone involved before construction starts to go over the project, the inspections and the utilities, so plan to be there. After that, our own crew does the grading, forming, pouring and finishing.

  4. Walk the finished lot

    I go over the finished lot with you at the end and show you where the joints run and what to watch for. I'll also tell you when it's ready for cars and when it's ready for trucks.

Why Temecula property owners call Cornerstone Temecula Concrete Works for their lots

  • The owner gives your estimate

    I come out myself to look at your lot and write the estimate, and our own crew does the forming, pouring and finishing. The person who planned your truck lanes is the one answering for how they get built.

  • Since 2013, fixing before that

    We've been in business since 2013, and before that I spent years patching walks, steps and sunken slabs for a property management company. Most of that failed work traced back to something nobody explained, so I explain each step before we start.

  • Licensed and fully insured

    We're licensed and fully insured. On a lot your customers and tenants still have to get past while we work, that's something you want settled before anyone shows up.

  • Permits in hand before paving

    Temecula requires every permit tied to paving to be in hand before any paving is done, so we start on that paperwork as soon as you give the go-ahead. It's the part of a lot job that most often sets the calendar, so it's the part we start first.

On a parking lot, the part that counts most is the part under the concrete. Send us the details of your lot or call (951) 466-2622, and I'll come take a look.

Building parking lots in Temecula and the cities around it

Before anyone paves a lot in Temecula, the city has a say. The city's Department of Public Works issues grading permits, which may be required when paving is part of private development, and any paving in the public right-of-way, the strip of public land along the street, needs an encroachment permit. Whether your lot needs a grading permit usually isn't settled until the city sees the plans, so we work out which permits the job goes through, pull them, set up the inspections and tell you what falls on your side as the owner.

Around here we see plenty of small business lots and shared lots behind shops where delivery and trash trucks cross the same pavement cars park on, and that's usually where the breakup starts. We plan those lots the same way on jobs in Murrieta and Menifee.

Questions about concrete parking lots in Temecula

How much does a concrete parking lot cost in Temecula?

The cost of a concrete lot comes down to its square footage, how much of it is built heavy for trucks, what old pavement has to be torn out and hauled away, and how much grading the drainage needs. Building only the truck lanes and pads in concrete costs less than a full lot, while a stormwater plan or a soils report adds work of its own. I'll walk your lot and give you a written estimate so you have a real figure instead of a guess.

How long does a concrete parking lot last?

Concrete parking lots typically last 20 years or more, according to an industry guide for this kind of paving. The same guide counts fairly simple upkeep among concrete's advantages. Where your lot lands in that range depends mostly on the base under it and whether the heavy trucks run where the lot was built for them.

Is concrete or asphalt better for a parking lot with truck traffic?

For a lot where trucks turn and park, I'd pick concrete, because it holds its shape under turning wheels instead of pushing into ruts and ridges. It also sheds water with only a slight slope, so the lot can sit fairly flat and still drain, and the pavement as a whole can often be built thinner than asphalt on the same ground.

What is a stormwater plan and does my Temecula parking lot need one?

Some projects need one, and when a Temecula project has a stormwater plan, which the city calls a WQMP, the final plan has to be done before grading or building permits are issued. Once it's approved, it's recorded with the property and has to be kept up for the life of the project, so that part stays with you as the owner. You can read the city's stormwater plan requirements, and I'll tell you at the estimate whether it looks like it touches your job.

How do I get rid of old asphalt and construction debris in Temecula?

In Temecula, all waste and debris hauling, construction and demolition debris included, goes through CR&R Incorporated, which holds the city's exclusive franchise. The permit holder arranges that removal with CR&R, so we sort out with you at the estimate who that is on your job and plan the tear-out around it.

Do I need a soils report to build a parking lot in Temecula?

You might, since the city's land development submittal list includes a soils report prepared by a geotechnical engineer, a specialist who tests the ground, and it can be no more than 6 months old. If you already have one, check its date, because an older report won't meet that list, and I'll ask about it when we walk the lot.

  • Light poles, sign posts and the low walls around a lot all stand on footings, and a footing set too shallow leans long before the pavement wears out.

  • If the building beside your lot has sunk at a corner, raising it first gives the new pavement a level edge to meet at the doors.

Where we build concrete parking lots

Cornerstone Temecula Concrete Works is based in Temecula, CA, and works across 12 service areas in Riverside County and north San Diego County, including Wildomar and Fallbrook. If you don't see your city listed, call and ask.

Temecula, CA

Book a walk-through of your parking lot

Have the lot's address, its rough size and the kinds of trucks that use it ready when you call (951) 466-2622, so I come out knowing what to look at.